Monday, May 19, 2014

WEEK 14

Title: Preparation for presentation FYP-2

Introduction

During this week is a presentation week for all student taking the subject FYP2/14. In this presentation,the student is required to prepare with provide a poster for the project. Presentation project is important to ensure students will present with respectively project by the desired assessor. The format for final year project presentation was provided to the students. The overall mark obtained by students is the average mark given by supervisor and second assessor. This week,a preparation for presentation day will be made and discussed clearly. The final project presentation will be held at Gemilang Hall and start form 8.00 a.m till 12.30 p.m. Students will be assessed by two persons of invited assessor from related department with the project title.

Objectives

1. To make some preparations before presentation day.
2. To presented the function of completed project hardware.

Project Encountered

For this activity in this week,did't have a problem to prepare presentation day for final year project 2.

Project Description

From all the information gathered during the week before will be extracted in away that is easily understood by the required assessment criteria. Below showed the FYP2 project presentation assessment that must following by students:




Figure 1: FYP2 Project Presentation assessment.



Figure 2: Cont..


Figure 3: Cont..

Project Outcome

For presentation day, my assessor are Mohd Raziff Abd. Razak and Siti Zajummi Mohd Zawawi. I had presented about my project that is Microcontroller Based Eggs Incubator.



Wednesday, May 7, 2014

WEEK 13

Title : Project Poster


Introduction


A poster is any piece of printed paper designed to be attached to a wall or vertical surface. In this FYP Sem 2 all students required to provide poster during presentation day. Students need to design the poster based on own project and by referring the FYP Sem 2 guideline that already have at FYP BMI website.

Objectives

1. To complete design the poster of project.
2. To design the poster based on guideline FYP required.

Problem Encountered

During this activity there are no problem I get because the guideline already giving, so it's easy for me to referring.

Project Description


Throughout the process of making a poster application used to create the poster is the software publisher.

This is because Microsoft office publisher is easy to use and also easy to set A1 (Potrait) as a guideline requirement.The content in a poster based on the project and according to the requirements supervisor and
guideline.



Figure 1: FYP Sample Poster .


Project Outcome

As a project outcome ,the activity in this week is done and below the picture poster for presentation project of Microcontroller Based Eggs Incubator.


Figure 2: Poster Project completed.


Monday, May 5, 2014

WEEK12

Title: Mechanical Installation

Introduction

In this week,I am continue the activity for previous week to complete install the mechanical project.

Objectives

1. To complete installation mechanical design of project.


2. To apply the equipment and materials that appropriate with specification of project.

Problem Encountered

In this week the problem during installation mechanical project is to install and mounting the DC motor to make sure the conveyor can move smoothly and the motor chain will not slipped from the sprocket as a required in this project.  



*The video show of problem, that chain motor not moving smoothly when DC motor run.

Project Description

To solved the problem in this week, I am try to change the mounting of DC motor. This is because, the week previous I'm use the cable tie to tighten between DC motor and holder motor. So, that why the DC motor still moving and not stable when run. Then, this week I'm use U-clamp to clamp the DC motor with holder motor to ensure the chain and motor can run smoothly and not slipped as a week before.



Figure 1: U-clamp


Figure 2: The installation DC motor before and after.

Project Outcome


As a project outcome in this week activity is I 'm complete install mechanical project and solved the problem during this week. Below is the picture and video progress project in this week.




Figure 3: Complete installation Eggs incubator project. 


Figure 4: Cont..





                                    
                                                    *Video show how the rotation eggs run.





                                                   *Video how the fan of project function.

Thursday, May 1, 2014

WEEK 11

Title: Mechanical Installation

Introduction

Mechanical installation is the one part of hardware development, it's most complicated to install because it need to relate with electronic design that designed in the previous week. This week, all works that relate with this matter will be discussed and shown clearly.

Objective

1. To complete installation mechanical design of project.

2. To apply the equipment and materials that appropriate with specification of project.

Project Encountered

All works that made is based on the project design and electronic design that has been implemented before. Thus, it does not give any either before, during do this activities. However, this activities is still in progress.


Project Description

The installation mechanical plastic acrylic and wiring for this project is made separately. The following is the procedures to install and wire all the components that used in this project show below :-

Step 1

First, cut  acrylic plastic according to the size of the drawing's project.


Figure 1: Cutting the Acrylic plastic.

Step 2


Drill holes in the plastic acrylic by location and mechanical components to be in the stick later on measurements that have been made.


Figure 2: Drill holes of acrylic for mount the components and others mechanical.

Step 3


Third, affix all acrylic plastic cut to size using Styrofoam. All design based on mechanical drawing's.





Figure 3: Affix and design mechanical project.

Step 4

Lastly, try to mounting the components of project.





Figure 4: Mounting the component.

Project Outcome


As a conclusion for this activity is not completely done and it will continue for the next week to complete the task.