Monday, May 5, 2014

WEEK12

Title: Mechanical Installation

Introduction

In this week,I am continue the activity for previous week to complete install the mechanical project.

Objectives

1. To complete installation mechanical design of project.


2. To apply the equipment and materials that appropriate with specification of project.

Problem Encountered

In this week the problem during installation mechanical project is to install and mounting the DC motor to make sure the conveyor can move smoothly and the motor chain will not slipped from the sprocket as a required in this project.  



*The video show of problem, that chain motor not moving smoothly when DC motor run.

Project Description

To solved the problem in this week, I am try to change the mounting of DC motor. This is because, the week previous I'm use the cable tie to tighten between DC motor and holder motor. So, that why the DC motor still moving and not stable when run. Then, this week I'm use U-clamp to clamp the DC motor with holder motor to ensure the chain and motor can run smoothly and not slipped as a week before.



Figure 1: U-clamp


Figure 2: The installation DC motor before and after.

Project Outcome


As a project outcome in this week activity is I 'm complete install mechanical project and solved the problem during this week. Below is the picture and video progress project in this week.




Figure 3: Complete installation Eggs incubator project. 


Figure 4: Cont..





                                    
                                                    *Video show how the rotation eggs run.





                                                   *Video how the fan of project function.

No comments: